This report is an addition to the previously submitted deliverable 3.2, and contains only the parts related to the RISE pilot.
The RISE pilot was found to have a low level of instrumentation, but using various sources, it was possible to give a conservative estimate of the waste heat potential of the building
at different supply temperatures. Based on this conservative estimate, approximately 26% of the yearly energy use can be supplied with a supply temperature of 80 degrees Celsius.
